TOWER AND WIND TURBINE GENERATOR (WTG) INSTALLATION (#93)
OFFSHORE WIND MARINER UPDATE NO. 93
REVISED
STATUS: Active
Beginning in September the jack-up vessel SEA INSTALLER will be installing the Towers and Wind Turbine Generators (WTG's) in OCS-A 501. The installation will begin at positions that have Monopile Foundations (MPs) and Transition Pieces (TPs) installed. This work will also include blade work and maintenance.
The feeder barges MARMAC 400 & PREVAILING WINDS, assisted by the tugs NICOLE FOSS, MICHELE FOSS, EARL W REDD, HAWAII FOSS, will assist in supplying materials for installation from the staging area in New Bedford, MA. The OSV CADE CANDIES and C-PIONEER will be supporting crew transfer operations.
Standing by on VHF channel 16
LOCATION(S): Completed monopile foundation (MP) and transition piece (TP) locations in OCS-A 501 lease area
SEA INSTALLER
Flag: Denmark
Length: 434’
MMSI#: 219456000
NICOLE FOSS
Flag: USA
Length: 130’
MMSI#: 367774490
MICHELE FOSS
Flag : USA
Length: 130’
MMSI#: 367657270
EARL W REDD
Flag: USA
Length: 89’
MMSI#: 367765170
HAWAII FOSS
Flag: USA
Length: 105’
MMSI#: 368296000
CADE CANDIES
Flag: USA
Length: 200’
MMSI#: 369108000
C-PIONEER
Flag: USA
Length: 260’
MMSI: 368291370
VINEYARD WIND
Crista Bank, Fisheries Manager, Cell: 508-525-0421 • Email: cbank@vineyardwind.com
Jeannot Smith, Marine Liaison, Cell: 904-613-0134 • Email: jsmith@vineyardwind.com
Travis Lowery, Fisheries Liaison, Cell: 508-728-4529 • Email: tlowery@vineyardwind.com
VineyardWind.com • info@vineyardwind.com • 508-717-8964
700 Pleasant Street, Suite 510 • New Bedford, MA 02740