Vineyard Wind and its contractor, Lawrence Lynch, will be installing the underground duct bank within Independence Dr during the week of March 7. One lane of traffic will be closed with a police detail present to manage traffic. Operations active between 7:00am-3:30pm Monday – Friday, weather permitting.
Read MoreVineyard Wind and its contractor, Lawrence Lynch, will be installing the underground duct bank within Attucks Ln during the week of March 7. One lane of traffic will be closed with a police detail present to manage traffic. Operations active between 7:00am-3:30pm Monday – Friday, weather permitting.
Read MoreVineyard Wind is working with contractor, Lawrence Lynch who will be mobilizing equipment to this area in preparation to commence splice vault installation for the offshore wind farm. Operations active between 7:00am - 3:30pm daily.
Starting on or after November 18th, Vineyard Wind and its contractors will begin preparation for Horizontal Directional Drilling (HDD) Line 1 at Covell’s Beach Parking Lot. This activity will take place from 7:00am-7:00pm daily and will continue through approximately the week of January 10th 2022.
Read MoreVineyard Wind and its contractor, Lawrence Lynch, will be installing underground splice vaults within Attucks Lane until approximately November 15th. One lane of traffic will be closed with a police detail present to manage traffic. Operations active between 7:00am - 3:30pm daily.
Read MoreVineyard Wind 1 and its contractors will be commencing installation of underground splice vaults on Independence Drive for the eventual interconnection of the power produced by the offshore windfarm to the power grid at the substation site.
Read MoreVW1 and its contractors continue to modify 40 Communications Way in Hyannis by removing a maintenance building on the property in preparation for the new substation to be built.
Read MoreVineyard Wind 1 and its contractors will begin surveying Covells Beach. The purpose of the survey is to determine the presence and location of areas of shallow rock or large boulders to further inform the design of the horizontal directional drilling (HDD).
Read MoreVW1 and its contractors will be conducting test pits at Independence Drive and Attucks Lane starting Tuesday the 21st from 7am-3:30pm each day. The testing will be done to verify the locations of underground utilities prior to the commencement of roadway work.
Read More